ACI Infotech

/ Cloud Modernization

Cloud Modernization Without the Chaos

ACI Infotech migrates and modernizes enterprise estates across AWS, Azure, and GCP: 200+ migrations delivered with phased cutovers and zero downtime. We sort the estate with the 6R framework, move what earns its move, retire what does not, and leave you with infrastructure as code and a bill finance can read.

Your estate
Data center VMs
Legacy apps
Databases
Middleware
File shares

Migration factory

assess · plan · move

Rehost
Replatform
Refactor

estate → factory → cloud

Amazon Web Services
Microsoft Azure
Google Cloud
Google Cloud

200+ cloud migrations

Delivered across all three clouds.

Sorting the estate

Move the estate in waves.
Keep the business running.

Sort the estate honestly first: what moves as is, what gets a new platform, what earns a rebuild, what retires with a small party. Then migrate in waves sized to keep every cutover boring. Renewals shrink, every server gets an owner, and the bill starts telling the truth.

Amazon Web Services
$8M
Saved per year

Data center exit in 18 months with zero downtime

Insurance · A Fortune 500 insurance carrier
Read the case study

/ What we do

From migration to run. Six disciplines.

01

Cloud migration

Rehost, replatform, or refactor to AWS, Azure, or GCP, moved in waves with rehearsed cutovers. 200+ migrations delivered without production downtime, and the legacy estate actually gets decommissioned instead of running just in case.

AWS
Azure
GCP
VMware Cloud
02

Application modernization

Monoliths refactored to microservices, legacy applications containerized, CI/CD wired in. Teams ship 3 to 4x faster once deployment stops being a ceremony.

Kubernetes
Docker
Terraform
GitOps
03

Kubernetes platform engineering

Enterprise Kubernetes with service mesh, observability, and security built into the platform, not bolted onto each cluster. Developers get self-service; the platform team gets one estate to manage instead of forty snowflakes.

EKS
AKS
GKE
OpenShift
Istio
04

Infrastructure as code

Every environment defined in Terraform or Pulumi, version-controlled and reproducible. Drift gets caught by a pipeline, not discovered during an outage.

Terraform
Pulumi
CloudFormation
Ansible
05

Cloud security and compliance

Landing zones with guardrails, zero-trust network design, and compliance automation from the first workload. The audit becomes a report you export, not a quarter you lose.

AWS Security Hub
Azure Security Center
CIS Benchmarks
06

Cloud cost optimization

FinOps from day one: tagging, budgets, right-sizing, and committed-use planning. Our engagements typically cut infrastructure cost 15 to 25%, mostly by turning off what nobody was using.

AWS Cost Explorer
Azure Cost Management
Spot Instances

The 6R framework, on one screen

Every workload gets one of six calls before anything moves. This is the sorting exercise most migration plans skip, which is why most migration plans slip. A typical estate ends up using at least four of the six.

01

Rehost

Lift and shift as-is. Right when the data center lease is the deadline and the app just needs a new home.

02

Replatform

Small upgrades on the way over, like managed databases. Right when minor changes buy major running costs.

03

Refactor

Rebuild for cloud-native. Right for the applications that carry the business and need to scale or ship faster.

04

Repurchase

Swap it for SaaS. Right when a commodity application is no longer worth owning.

05

Retire

Turn it off. Right more often than anyone admits; every estate has servers nobody can name a user for.

06

Retain

Leave it where it is, for now. Right when latency, licensing, or regulation says the move costs more than it returns.

/ How an engagement runs

Five phases. No mystery.

01

Inventory

Weeks 1 to 4

Map the estate, the dependencies, and the contracts. Every workload gets a 6R call and a named owner.

02

Design

Weeks 3 to 6

Landing zone, guardrails, network, and identity, plus a cost model finance can hold us to.

03

Migrate

Weeks 6 to 12

First workloads land inside 12 weeks. Waves after that, each cutover rehearsed before the real one.

04

Prove

Parallel run until the numbers and the latencies match. Nothing legacy is switched off on faith.

05

Run

FinOps, patching, and around-the-clock operations under SLA with our team, or a clean handover to yours.

Someone still has to run it.

After the migration, the estate needs a pager that gets answered. Our managed NOC runs client clouds 24/7 with follow-the-sun coverage, L1 to L3 escalation, P1 response in fifteen minutes, and uptime targets of 99.95% or higher. The engineers who designed the platform stay on the console.

/ Why ACI

Why enterprises pick us for cloud

/ Delivery

The architects who plan your migration run your cutover.

No handoff between the pitch team and the delivery pod.

/ Clouds

Certified on AWS, Azure, and GCP, with 200+ migrations delivered.

We design for your estate, not our partnership tiers.

/ Scale

Founded 2006.

1,200+ engineers across 11 global delivery hubs. 500+ enterprise projects.

/ Operations

ISO 27001 certified, with 24/7 managed NOC coverage under published SLAs.

/ Questions

Cloud questions,
answered straight.

The questions we hear most before a migration. Anything else belongs in a conversation.

A landing zone and first workloads land in 8 to 12 weeks. A full estate move runs 6 to 18 months depending on complexity, delivered in phased waves so value ships long before the last server moves.

The 6R framework: rehost, replatform, refactor, repurchase, retire, retain. Not everything should move, and not everything should be rewritten. We sort the estate first so spend goes where it returns something.

It depends on your existing investments, workloads, and regulatory needs. We hold certifications on all three, so the recommendation follows your estate, not our margins. Plenty of enterprises run more than one.

Parallel run and phased cutover. The new environment runs alongside the old until it holds up under real load, then traffic shifts. We rehearse every cutover before doing it for real, which is how 200+ migrations have shipped without production disruption.

FinOps from day one: tagging, budgets, right-sizing, and committed-use discounts where usage is steady. Most cloud overspend is not the cloud being expensive. It is workloads nobody turned off.

Security moves first, not last. Identity, encryption, network segmentation, and compliance controls go into the landing zone before any data does.

We design for portability where it matters: containers, infrastructure as code, and open standards. Where a cloud-native service earns its keep, we use it with eyes open rather than avoiding it on principle.

Both options. Our managed NOC runs it 24/7 under SLA with P1 response in fifteen minutes, or we hand over to your team with runbooks and stay on call through the transition.

Scroll to Top